News Flash

Engineering - Word on the Street

Posted on: February 10, 2021

Rollingbrook Drive Reconstruction Project

Download the Word on the Street (PDF)

ROLLINGBROOK DRIVE RECONSTRUCTION PROJECT

Please be advised of the following start of construction and lane closure information.   The Rollingbrook Drive Reconstruction project will begin on February 10, 2021. The start of construction work will require lane closures to remove and replace pavement and complete water line replacement. Precautions are being taken to minimize disruption to area businesses and the public. We apologize for any inconvenience this may cause.

Lane Closure Information:

Phase 2 of the Rollingbrook Dr. Reconstruction project will bring changes to traffic patterns and lanes of travel.  Please drive with caution.  

 East Bound Lanes of Rollingbrook Dr. will be closed to all through traffic on Rollingbrook Drive from Spur 330 (Decker Drive) to Goose Creek Bridge. The intersection of Rocky Knoll Dr. will be maintained open to traffic, but is planned to have a short-term closure for fast track reconstruction. 

 East bound and west bound local traffic will share one lane each on the existing westbound lanes.    Due to this condition, alternate routes are recommended for through traffic.   Every effort will be made to accommodate local traffic with destinations within the construction zone.

Please be safe and courteous - follow all traffic control signs and flagging personnel instructions for their safety and yours.  


Rollingbrook Phase 2A

Facebook Twitter Email

Other News in Engineering - Word on the Street

Lane Closures

Fred Hartman Bridge Closure

Posted on: November 22, 2021